Jumbuck Gold Project

Jumbuck, (formerly the Western Gawler Gold Project) is located in north-western South Australia, on the western edge of the Gawler Craton.

Share Price
$0.020
ASX:TYX
18/08/2017 delayed 20 minutes

Introduction & Tenure

Jumbuck, (formerly the Western Gawler Gold Project) is located in north-western South Australia, on the western edge of the Gawler Craton. The tenement package of 7,926km2 (including applications) comprises two groups – those held 100% by Tyranna, and a number of tenements held in JV with WPG, in which Tyranna currently holds 71% of the gold rights only. WPG own the Challenger Gold Mine, which is centrally located with respect to the tenement package.

Project Location

Project Highlights

  • Tyranna Resources Limited control +8,000km2 surrounding the Challenger Gold Mine
  • Challenger has produced over 1Moz @ ~6g/t Au since 2002
  • Resurgence in activity in Western Gawler Craton
  • Tyranna Resources Limited has largest and most prospective land holding

In this section


ASX Announcements